Skip to main content
EN ID
← All insights

Booth, Fit-Out & Retail Signage Pricing Guide 2026: Jakarta Cost Breakdown

Production work ranges from IDR 5M (small signage) to 1B+ (premium booth). We break down by category: booth, interior fit-out, retail signage, custom furniture, CNC service.

The question "how much does a booth cost?" or "how much for a cafe fit-out?" has no single answer. But there's an understandable cost structure, and benchmarks brand managers can use for planning.

Main production cost components

  1. Design & engineering, 5-12% of total. Concept, 3D render, technical drawing.
  2. Material, 35-50% of total. Multiplex, HPL, acrylic, metal, LED, finishing.
  3. Production (including CNC), 20-30% of total. Precision cutting, fabrication, assembly.
  4. Finishing, 10-15% of total. Paint, laminate, polishing, detail.
  5. Installation, 8-15% of total. Loading, onsite setup, crew.

Work categories and 2026 price ranges

Exhibition & Event Booth

Custom exhibition booth: IDR 3-12M per m² for 30-100m² sizes. Premium with LED wall + special features: IDR 8-18M per m². Small booths (9-18m²) with shell-scheme mods: IDR 15-40M flat.

Interior Fit-Out (Cafe, Office, Clinic)

Cafe/restaurant fit-out: IDR 4-10M per m² (depending on finishing tier). Office fit-out: IDR 3-8M per m². Clinic with medical standards: IDR 5-12M per m² (higher due to material regulation).

Retail & Signage

Acrylic signage (3D letters, neon sign): IDR 500k-3M per letter depending on size and finishing. Retail shop display: IDR 5-20M per linear meter. Seasonal window display: IDR 15-50M per set.

Custom Furniture

Custom reception desk: IDR 15-80M (depending on material & size). Cafe kitchen set: IDR 8-20M per linear meter. Built-in retail display: IDR 5-15M per linear meter.

CNC Service (White-Label)

CNC Laser acrylic cutting: IDR 150-500/cm² depending on thickness. CNC Router multiplex: IDR 200-600/cm². Minimum order typically IDR 500k. Standard lead time 2-5 days, rush 24-48h with 30-50% premium.

Factors impacting price

  • Material tier, standard vs premium multiplex (Meranti vs Yellow Meranti), local vs imported HPL
  • CNC complexity, simple cutting vs multi-layer + engraving
  • Finishing, duco vs melamine vs laminate vs manual painting
  • Lead time, rush projects (< 14 days) add 20-40% premium
  • Installation location. Jakarta standard, outside Jakarta adds 5-15% logistics
  • Reusability, modular multi-show booths cost more first show but save 40-60% on next shows

Why first-hand producer pricing is more transparent

Producers with their own workshop and CNC can break down: material X million, CNC cutting X hours, finishing X people X days. Agents who subcontract can't, they give lump-sums because they don't know their vendor's detailed costs. Brands requesting detailed breakdowns are usually screening producers vs agents.

Optimizing budget without sacrificing quality

  1. Brief with specific numbers , "IDR 200M budget" more effective than "best possible"
  2. Invest in modular design, first show 10% premium, shows 2-3 save 40%+
  3. Freeze scope early. H-21 minimum for booth, H-30 minimum for fit-out
  4. Choose transparent partners on cost breakdown, avoid lump-sums without detail
  5. Ask: what % production in-house vs subcontract, higher in-house = more stable pricing

Conclusion

Production pricing is a function of material, complexity, lead time, and who produces. First-hand producers with their own CNC can offer more efficient and transparent pricing. Aware brands in 2026 screen contractors not just by final price but by explainable cost structure.

Share this insight

WhatsApp LinkedIn X

Let's discuss your project

Brief via WhatsApp for fast response, or email to send documents & references.

Scroll to Top