Slots open for Q3-Q4 2026 · Brief now to lock workshop timeline
02 / SERVICESInterior Fit-Out Contractor Jakarta — Showrooms, Offices, Retail, Precision Build
Showrooms, experience centers, offices, clinics, cafes. Precise fit-out.
Permanent spaces with temporary-build discipline. We bring exhibition precision in detail, timeline, and layer-by-layer finishing to fit-outs that last years.
Reply in <30 min · Free consultation · Initial estimate in 5 days
What we deliver
- Automotive showroom, retail concept, experience center
- Corporate office, co-working, headquarter branding
- Clinics, medical spaces, wellness centers
- Cafes, restaurants, F&B retail
- Custom millwork, feature wall, ceiling design
- Integrated MEP coordination, flooring, lighting, signage
Why clients pick Magna Production
interior fit-out is not a scarce commodity in Jakarta — plenty of agencies and contractors can offer the same thing on paper. What separates us is who actually owns the machines, who just stitches subcontractors together, and who will take responsibility when a site problem appears. Magna stands in the first category.
Own CNC in Bekasi
Not quoted out to subcontractors. We cut ourselves — acrylic on CNC Laser, plywood on CNC Router. Quality, timeline, and price all in our hands.
1,000+ m² workshop + 30+ crew
Parallel capacity for 4–6 active projects, so rush orders absorb without shortcutting finishing. Own workshop = own operators = own SOPs.
Cleaner margins
No agent layer on top of us, so pricing runs 10–20% more rational than contractors who outsource. You pay production, not middleman mark-ups.
Reality-checked engineering
Design and workshop sit on the same team. Every shop drawing gets verified by the CNC operator directly — no surprises on-site.
Serious brand portfolio
BMW, JAC, Michelin, Xiaomi, TikTok, Alpha IVF, Bioaqua, Bank DKI, Tokopedia — brands that are serious about detail, timeline, and brand consistency.
Transparent documentation
Weekly progress photos, shop drawings shared, on-site QC reports. You never go blind on project status.
Realistic cost & timeline ranges
We share these ranges so your team can shortlist vendors at a realistic budget. Final numbers depend on scope detail, material choice, and urgency — but the ranges below cover ~80% of projects we deliver.
| Scope | Range | What is included | Ask |
|---|---|---|---|
| 100m² basic office Most chosen | IDR 450–750M | Partitions, ceiling, flooring, standard MEP, pantry | Ask |
| 200m² automotive showroom | IDR 1.2–2.5B | Feature wall, display, dedicated lighting, brand elements | Ask |
| 150m² specialist clinic | IDR 950M – 1.6B | Medical MEP, hygiene surface, reception & consultation | Ask |
| 120m² cafe/restaurant | IDR 700M – 1.4B | Kitchen set, bar counter, custom seating, signage | Ask |
Realistic timeline
Standard 8–10 weeks end-to-end: design development 3 weeks, construction & fit-out 5–7 weeks, handover & punch-list 1 week. Complex spaces like medical or F&B can stretch to 12–14 weeks because of more intensive MEP coordination.
Need a precise quote for your project? 30-minute brief, we come back with detailed estimate in 5 business days — including material BoQ, shop drawing overview, and a timeline that holds.
Projects we have delivered
Our process
-
01
Brief & Site Survey
Measure space, photograph, understand brand guideline & functional requirements.
-
02
Schematic Design
Layout, zoning, mood direction. Feedback loop before detailing.
-
03
Design Development
Photoreal 3D render, material spec, detailed BoQ.
-
04
Construction Doc
Shop drawings, MEP coordination, permit support.
-
05
Fit-Out Work
Dismantle existing, MEP, ceiling, millwork, flooring, finishing.
-
06
Handover
Snag list, touch-up, user training, warranty.
Industries we serve
- Automotive (BMW, JAC)
- Tech workspace (TikTok, Tokopedia)
- Health (Alpha IVF clinic)
- F&B & lifestyle
Jakarta: CBD (SCBD, Kuningan, Thamrin), Mega Kuningan, Tebet, Kelapa Gading. Tangerang: BSD, Gading Serpong, Alam Sutera. Bekasi, Bogor, Depok.
Frequently asked
Difference from regular interior contractors?
We bring exhibition discipline: tight timelines, obsessive detail, layered finishing. Plus in-house CNC, so custom elements aren't outsourced.
How long for a 200m² office fit-out?
Standard 8 to 10 weeks end-to-end (design 3 weeks, construction 5 to 7 weeks). Rush possible with fast design freeze.
Do you accept design-only without build?
Yes. Design fee matches scope. But maximum value comes when design-build stays one team.
Ready to discuss your project?
30-minute brief. We come back with moodboard and preliminary estimate in 5 business days.